Construction of the bridge began in 1886 and was completed in 1894.
The photos show the steel framework of the two piers, which were clad in Cornish granite and Portland stone to protect the underlying steelwork.
Below is a sequence of 8 photos of the construction.
A postman tries to deliver the mail to a premise on Watling Street. The morning after a Luftwaffe raid.
St Paul’s Cathedral, stands defiantly, through the mist, in the background.